Menghilangkan Shadow pada Animasi Solid SPRY Scheduler

Tampilan animasi solid di SPRY scheduler merupakan salah satu aspek penting dalam membuat scheduling. Sering kali user mengecek animasi dari urutan/sequence yang telah mereka atur agar sesuai dengan yang diinginkan. Namun, karena pengaturan default animasi solid SPRY scheduler adalah berbayang/shadow, maka hal ini cukup mengganggu user ketika melakukan proses pengecekan animasi. Selain itu, pengaturan default […]

Removing Shadow on SPRY Scheduler Solid Animation

Solid animation display on SPRY Scheduler is an important aspect of creating schedules. Often times, users check the arranged animation from the sequence they made to suit their preferences. However, the solid animation default setting is shadow which makes it harder for users to check the animation. Furthermore, the default shadow animation setting causes the […]

Continue reading
Set up Animation Layout Template in SPRY Scheduler

Animation is one of the main features of SPRY Scheduler, one of its functions is to arrange the layout on the SPRY graphical output. Everything displayed in the animation will also be displayed in pictures or videos exported from SPRY Scheduler. When setting up the animation display, it is not uncommon for users to have […]

Continue reading
Set up Template Layout Animasi SPRY Scheduler

Animasi merupakan salah satu fitur utama pada SPRY Scheduler yang salah satu fungsinya untuk mengatur layout pada graphical output SPRY. Semua yang ditampilkan pada animasi akan ditampilkan juga pada pictures ataupun video yang diexport dari SPRY Scheduler. Pada saat mengatur tampilan animasi, tidak jarang user memiliki pengaturan layout tersendiri seperti sudut tampilan animasi, dll. Layout […]

Continue reading
Membuat Triangulation di SPRY

Triangulasi  merupakan data yang sering digunakan untuk membuat animasi SPRY menjadi lebih informatif. Triangulasi yang sering digunakan pada animasi SPRY adalah triangulasi topografi yang telah di digabungkan dengan Final Pit Design. Sebelumnya, triangulasi harus diproses di software lain terlebih dahulu baru dimasukkan ke dalam SPRY. Saat ini, dengan fitur baru Triangulation, Bapak/Ibu sudah bisa langsung […]

Continue reading
Creating Triangulation in SPRY

Triangulation is a commonly used data type for enhancing the informativeness of SPRY animations. The most common type of triangulation used in SPRY animations is topography triangulation, which is combined with the Final Pit Design. Previously, triangulation had to be processed in other software before being imported into SPRY. Now, with the new Triangulation feature, […]

Continue reading
Effective Management of Multiple Equipment in Manual Scheduling

When conducting manual scheduling, you will be determining the work area for each piece of equipment during specific time periods. Sometimes, there is a chance of forgetting the work area boundaries for each piece of equipment, which may lead to overlapping work areas for different equipment (Multiple Equipment). This can be prevented by following the […]

Continue reading
Cara Efektif Mengatur Multiple Equipment Pada Manual Scheduling

Pada saat melakukan manual scheduling, Anda akan menentukan area kerja masing-masing Equipment dalam periode waktu tertentu. Terkadang Anda berpeluang melupakan batas area kerja dari setiap Equipment yang dikhawatirkan akan menyebabkan tumpang tindih area kerja untuk Equipment yang berbeda (Multiple Equipment). Hal tersebut dapat dicegah dengan mengikuti tips di bawah ini : 1) Pastikan Equipment pertama […]

Continue reading
Unveiling How To Determine Standby Time per Equipment

When performing auto scheduling, you may often find standby equipment due to the inputted dependency/ constraint settings. Did you know that equipment availability data, along with the corresponding amounts, can be displayed and exported in Excel format? By knowing the standby time, the scheduling scenario can be reassembled to optimize the results. 1) On the […]

Continue reading
Cara Mengetahui Jumlah Standby Time Per Equipment

Pada saat melakukan auto scheduling, kerap ditemukan equipment yang standby karena pengaturan dependency/constraint yang dimasukkan. Data dari equipment yang tersedia beserta jumlahnya dapat ditampilkan dan diubah ke dalam format excel. Dengan mengetahui standby time, skenario scheduling dapat diatur kembali sehingga hasilnya menjadi lebih optimal.   1) Pada menu Processes, tambahkan 1 Nonproductive Process (Contoh: beri […]

Continue reading
How Do We Know When a Disposal Capacity Is Already Full

In mining operations, Overburden Material Balance analysis is important to ensure the availability of disposal area. To analyze, we need some information such as when the capacity of a disposal area will be full, the amount of overburden that requires disposal, when to prepare a new disposal area, etc. With SPRY, the analysis of material […]

Continue reading
Displaying Excavation’s Start and End Dates in Animation

Below are the detailed steps:   1) Create “start date” and “end date” fields in source table     2) Create Post Schedule Tasks – New Copy Schedule to Source Table for start date dan end date fields as shown in the screenshot below.     3) Run post schedule task – New Copy Schedule […]

Continue reading
Menampilkan Informasi Tanggal Dimulai dan Berakhirnya Penggalian dalam Animasi

Berikut adalah langkah-langkah detailnya:   1) Buat field “start date” dan “end date” pada source table     2) Buat Post Schedule Tasks – New Copy Schedule to Source Table untuk field start date dan end date seperti pada screenshot di bawah ini     3) Run post schedule task – New Copy Schedule to Source Table     4) Generate […]

Continue reading
Create Range Without Using Script

Below are the steps: 1) On the Source Range column, click the “Set Inline Range From Drawn Shape” tool, as shown below. 2) Digitize the targeted polygon, then right-click when finished. Below is a sample of polygon’s digitizing result. 3) On the Source Range feature, add New Text Range. Copy the nodes recorded on “Inline” […]

Continue reading
Displaying the information on the daily equipment location plan in the Spreadsheet

Please refer to the following steps to display the information on the daily equipment location plan in SPRY:    1) Create reporting level for a certain daily period    2) Create pivot tables for the daily equipment, then drag the Source Quantity, Daily and Equipment,as shown in the screenshot below 3) Create pivot tables for the daily equipment, then drag the Source Quantity, Daily and Equipment, as shown in the screenshot below 4) Enter the formula below in the daily […]

Continue reading
Creating and Saving List of Equipment Labels 

There are many examples of equipment labels which can be displayed on the animation. In this Tips and Trick, we provide two examples, EquipmentBlockStrip_Rate and EquipmentBlockStrip_Material_Rate.      Below are the steps:    1) Right Click on Custom Fields, select Add, then click on New Text Custom Field to create a new custom field.    Before making the Equipment Label List, add several helping custom fields as below:   ShortName Equipment […]

Continue reading
Analysing Production Targets Achieved Using Gantt Charts  

Below are the steps to use Gantt Chart feature to analyse production targets.   For this simulation example, the annual coal production target is 3.2 million tons.    1) Open the Gantt Charts feature . 2) Right click on Gantt Charts—Select Settings—Results . In the first line, create, for example: “coal target 3,2 Mt Hit” and in the second line, create “Coal target not Hit”, then choose reporting level yearly as seen on the screenshot below.   3) In the coal target 3,2 Mt Hit section, fill the field value expression with […]

Continue reading
Periodical Data of Working Area

SPRY can bring out the periodical data of working area quickly and easily with the following steps. 1) Enter the data. Enter the data and ensure that it includes the Block Area information. 2) Create Block Area field. 3) Create two new fields for marking the top levels of each bench. 4) Import the data […]

Continue reading
Easy Way to Save Schedule Table Layout

Schedule is a SPRY’s feature in the form of a table and values resulted from simulation of scheduling, such as Operating Hours, Source Quantity, Source Percentage Completed, etc. Below is the default layout of a schedule table from left to right: Index- Source- Destination-Process-Equipment- and so on. Sometimes, not all of the available information in […]

Continue reading
Showing Data of Disturbed Area

Below are the steps to get the data of the disturbed area. 1. Enter the data Enter the data and ensure that it includes the Block Area information. 2. Create a Block Area field. 3. Create two new fields and set them as marking top level of each bench 4. Import the data to SPRY. […]

Continue reading